Activities:
1. LV building embankment for new S.B. Parker Road up to bridge, North and South approaches to bridge.
2. Scott Contracting pouring remaining section of pavement, E.B. Arapahoe Road, West of the bridge.
3. Absolute Quality pouring curb & gutter along turn pocket, E.B. Arapahoe Road, East of the bridge.
4. JDR laying coconut blanket and rock socks at various inlets and other locations around the project.
5. Concrete Coring Company drilling holes in box culvert along N.B. Parker Road for installation of fencing.
6. Hamon drilling dowel holes for new curb & gutter that is a replacement for the damaged curb & gutter that was removed at the entrance to the Ring Road.
7. Scheduling meeting. Main item of discussion was the layout of the temporary striping for the upcoming traffic switch. Colby Striping representative out at the project for a walk through.
8. WL fixing traffic cameras as well as wiring new heads for W.B. Arapahoe Road traffic in preparation for the upcoming traffic switch.