Monday, 7-25-11

Activities:

1. WL Contractors installing temporary traffic signal poles for W.B. Arapahoe Road traffic in preparation for the upcoming traffic switch.

2. Absolute Quality pouring curb & gutter at the right-out portion of the Ring Road.


3. LV removing soil piles along side the SW On-Ramp.

4. Hamon preparing ABC for median pavement on Parker Road.


Since people (mainly my father) ask about where I work when I am on-site, I have posted a picture of my desk area inside the field trailer. Mine is the one on the right, Mike, our materials guy, is the one of the left.