Monday, August 1, 2011

Monday, 8-1-11

Activities:

1. Hamon milling old W.B. Arapahoe pavement, East of bridge near the N.E. On-ramp.


2. Scott Contracting pouring concrete in median of Parker Road, South of the bridge.

3. WL working in traffic control box for the Araphoe Road & Parker Road intersection traffic lights. The intersection is hand-control by UTCs while WL installed a new surge suppressor. The previous suppressor was damaged by lightning.

4. LV working the sub-grade on what is the old W.B. Arapahoe Road area, East of the bridge.

5. LV removing soil pile between S.W. Slip Ramp & On-Ramp.

7. Hamon's structures crew setting forms for retaining wall footings along S.B. Parker Road detour, North of bridge. In the first picture the crew has the forms set for 9'-6" wide, which would be acceptable if the wall was to be 12' high. However, since the wall steps down 2' at the point in the picture, the wall will be over 14' high for each of the next four sections, which requires the footing be 11'-6" wide. This is shown in the second picture.



These are random pictures of the site. The first is the seeding and grubbing along the inside of the Loop Ramp. The second is of Scott's paving equipment that has been used for mainline Parker Road paving.